Tuesday, 18 October 2016

Blockwork and ground floor wall framing

The past 2 weeks has seen the blockwork go up and be core filled, and the internal walls downstairs are framed up. The stairs have been started and the sub floor for upstairs is going on. Exciting! We are getting a good idea of the internal spaces downstairs now, and I'm really happy with the layout. The ground has been shaped and the retaining walls sealed and back filled.
Looking up the left side of the house. It has since been shaped a bit more.

Looking towards the front left of the house - granny flat lounge - from the rear of the garage/laundry.

The granny flat bedroom and ensuite.

Front of the house showing internal framework and stairs.

Looking from the front right showing internal framing.